Multi-Wing 6W Replacement: How to Specify the UTEK-DELE 6W Complete Impeller
UTEK-DELE supplies a complete 6W axial fan impeller as a direct replacement for the corresponding Multi-Wing 6W configuration. To order it, identify the original build and say which machine-side parts stay in place. Compare the drive connection, installed position and shroud envelope on a common drawing reference, then approve the operating duty and supply scope. This procedure is especially useful when two machines share a 6W reference but have different shafts, flanges or shrouds.
As used here, a complete impeller is the blades and their matching hub configured as one rotating assembly. The retained drive, housing and nearby stationary components must be identified separately. The product-family drawings and an equipment record help you check the proposed configuration. A family code by itself does not establish that two units have the same mounting dimensions or duty. The named brand identifies the original product being replaced. The quotation and drawing for this guide come from UTEK-DELE.
Identify the original 6W and what will remain on the machine
Start with three views of the current assembly
Photograph the model and build information first. Include the entire label, any suffix and any separate marking on the hub. Note which model or serial information came from the fan and which came from the equipment. A label on an electric motor or an engine may be a useful clue for duty, yet it usually does not identify the impeller build. If a fleet uses the same machine model with several impellers, record which machine the photos came from and which station or service number distinguishes it.
Capture the installed relationship of the fan and shroud with the equipment secured under the site's service procedure. Ask approved maintenance staff to take the images and to handle any access past a guard. Take a whole assembly photograph, an interface photograph from the accessible side and a side-view reference of the sweep in the opening where the approved service access allows it. Keep the direction from which each photo was taken with the record. That matters if the supplier has to reconcile a shaft-side drawing with an air-inlet image.
Retrieve the original parts list, released drawing or accepted replacement record if available. Read these alongside the equipment condition. A maintenance rework may have added an adapter or changed where the hub sits, so the current interface may differ from an earlier drawing. Mark the difference for engineering. A supplier can prepare a comparison from a controlled drawing and labelled data from the installed machine. Files without the interface or revision need returning for clarification.
State the scope of supply in the first line
Use the complete configured impeller when replacement scope includes the rotating blade and hub assembly. In the purchase enquiry, state whether the attachment to the retained drive is part of the new hub or accomplished through a retained adapter. Identify which bolts, keys, bushes or other connection hardware are part of the quoted scope. The names of these features depend on the installed interface. Keep the approval references and hardware choices with the supplier's drawing and the equipment's instructions.
If the requested work is a blade-only repair, provide the retained hub and blade attachment data for a separate compatibility assessment. This article covers supply of a matched 6W assembly. The drawing of that assembly does not approve putting individual blades into an existing third-party hub, or mixing blades from different builds. Have the equipment authority determine if individual replacement is an acceptable repair before purchasing parts or planning site work.
Write down the retained shroud, guard, fan drive, shaft or adapter as applicable. Record the component identifier or the machine-side drawing that controls each retained part. If the job also changes any of them, ask the responsible person to record the change and review its effect on fit and duty. The supplier can then quote a specifically configured impeller against a known installation rather than assume that a new hub cures a worn or altered interface.
| Component | Usual complete-impeller enquiry record | What to resolve before release |
|---|---|---|
| Blades and hub | One matching configured 6W rotating assembly | Accepted blade count, material, pitch, rotation and drawing |
| Machine drive | Retained drive and connection details | Approved shaft, flange or adapter interface |
| Shroud and guard | Retained housing and envelope constraints | Required radial and axial clearance from equipment authority |
| Hardware | Supplier and buyer scope listed separately | Approved fastening and retention references |
| Acceptance checks | Drawing revision, fit and agreed duty checks | Which checks take place at supplier or machine |
Read the 6W listing as a family, then compare the hub
Know which details the catalogue can answer
The UTEK-DELE 6W product listing identifies a large-diameter adjustable-pitch family covering 560 to 2,200 mm, with 6 to 12 blades, W-3 and W-6 hub families, and PAG, conductive PAGAS or die-cast aluminium listed as material options. Those are family descriptions for organising an enquiry. They do not establish that every combination of diameter, blade count, hub and material is available for every duty. Use the offered drawing and technical data for the specific build.

W-3 and W-6 are useful screening terms. Neither hub name substitutes for the drawing of the connection to the customer's machine. Two rotating assemblies described by the same named hub family can have different mounting details in order to fit different shafts or adapters. A catalogue code may describe a family shared with another product and still leave the machine interface unresolved. The easiest way to avoid the ambiguity is to give the retained drive's connection drawing and require the offered configuration to show exactly how it mounts.
Where a previous order has both a model and a build reference, keep both. A buyer may know the catalogue model but not which assembly revision was installed. Any offer that changes a hub or interface calls for a side-by-side drawing review. The drawings should show which features remain identical at the machine and which dimensions are part of the product selection. Distinguish an intentional approved change from one that might alter the plane where the blades run.
Separate 5W reference for identifying the right family in a mixed fleet.
A 9W library example. Confirm the actual installed family from the equipment record.
Use a reference plane that survives a replacement
Choose a machine-side face that belongs to the retained installation and can be identified on the service drawing. The seating face of the retained connection may be the appropriate reference, depending on the design. Give it a label for discussion, show the direction of measurements along the shaft and maintain the same direction in both drawings. Ask the supplier to dimension the new assembly from the same reference. A comparison that starts from the front of each hub can hide a shift if hub thickness changes.
Compare the connection type, drawing-based fit, retention and axial position. For a bore, the controlling details may include diameter, fit and how the hub seats or is retained. For a flange, establish the pilot, mounting face, fixing pattern and any orientation requirements. The hardware and assembly requirements belong to the released documents. The purpose of the quotation checklist is to ensure the supplier draws those features, including any adapter, and marks the parts of the existing assembly that are assumed to remain.
Distinguish the motor or drive centreline from a nearby housing centreline. If a contracted machining or inspection party measures the assembly away from the machine, pass along the relevant relationship. A hub can fit a shaft and still put the rotation sweep off position with respect to an installed shroud. A comparison made from the common machine datum keeps that issue visible before parts are ordered.
Turn an adapter change into a reviewable drawing question
An adapter can make a complete impeller fit an older drive, but it also becomes part of the rotating interface and can move the fan. Ask the equipment engineer whether the adapter is retained, included in the offered assembly or engineered separately. If it is retained, check the old adapter's part reference against what is installed. Capture any features that determine concentric location and axial seating instead of relying on overall thickness. For an altered adapter, require its own approved drawing and check that the resulting assembly still lies within the accepted envelope and operating limits.
Consider a hypothetical quote where the supplier sends a forward-side view with a 42 mm offset from the new hub face. The field record instead gives 54 mm from a machine-side shoulder. Subtracting the numbers suggests a difference of 12 mm, but neither record has defined the distance between the new hub face and the shoulder. Ask for a revised dimension from the named shoulder or an approved section linking the two faces with signed dimensions. Only then can the buyer compare the resulting offset. This is a drawing-convention example with invented values.
Write the approved configuration as an evidence chain so the result can be checked later. The equipment record names the retained shaft and adapter. The offered assembly drawing shows the corresponding seating feature and the relative location of the blade sweep. The release record names the exact revision and any exceptions that were accepted. If a supplier provides two offers with different adapters, each offer needs its own assembly drawing or an explicitly controlled option. A single undifferentiated product image cannot support two configuration decisions.
Compare before asking for a fit decision
Give the reviewer a sheet with columns for the original assembly, the machine constraints and the offered assembly. That prevents an old fan's measured dimensions from being mistaken for the required boundary. For example, an existing assembly may sit toward the rear of a shroud and an engineer may permit a wider installed range. Record the actual location and the accepted range separately. The offered proposal can be assessed against the approved range while the old measurement remains available for troubleshooting.
Carry uncertainty into the comparison. If a photo confirms that a flange exists but not whether it locates on an internal or external pilot, record the connection type as unknown and point to an agreed drawing or approved inspection to resolve it. If a replacement offer is quoted without a revised interface view, ask the supplier to return a marked drawing for the proposed build. Mark any open line “hold for drawing confirmation” in the release record so completeness of other fields cannot disguise that gap.
| Question | What to supply from the machine | What the offer shows |
|---|---|---|
| Which hub family is proposed? | Original assembly record and machine connection reference | Named hub and approved configuration drawing |
| Where does it seat? | Retained face and positive axial direction | Offered seating surface on the same datum |
| How is the hub located? | Applicable bore, shaft or pilot features | Dimensions and connection details for the quoted assembly |
| How is it retained? | Applicable fixing and retention reference | Supplied scope and retained components identified |
| Where is the blade sweep? | Existing sweep position relative to the retained face | New sweep envelope relative to the same reference |
Check shroud clearance in two directions
Separate radial clearance from axial interference
Outer diameter is necessary information. A measured old diameter gives a starting point for the radial sweep, but the stationary opening may be irregular or not concentric. Record the acceptance basis set by the equipment team and note locations where the opening changes. A mid-height diameter on a drawing cannot identify a restriction such as a guard rim, uneven opening or nearby support. Provide the relevant views with the retaining face and the actual opening linked to them.
Axial clearance concerns the fore-and-aft space occupied by the rotating assembly. A hub can place a nominally equal sweep farther toward a radiator or through a different section of a bellmouth. The selected pitch and blade geometry can alter the occupied space across the chord. Ask for the outer envelope in the proposed configuration, not just a centreline or hub dimension. Note operating constraints that the equipment team says are relevant to the review.
Use the most restrictive part of the installation. A surrounding shroud may have a cone or taper so a small axial shift changes the available radial space. Check where a nearby obstruction sits along the axis before interpreting a single opening size. An installation drawing can show a permitted volume into which the rotating part should fit, with any conditions written by the machine design owner. Comparing profiles rather than isolated dimensions is more useful in such an opening.
Record tolerance and movement at the assembly level
Ask the responsible engineers to define the clearances and service conditions. Geometry checked at rest is one input. The actual installation may also have movement under operation, shaft or mount variation, temperatures, deflection or accumulated manufacturing variation. Figures from a brochure or another machine do not establish adequate clearance. Keep separate values for the required operating envelope and the measurements that are available to verify it.
For an illustrative drawing check, imagine a reference face at zero, and an engineer's approved axial envelope between 18 and 94 mm in front of that face. Proposal A shows its outer sweep between 25 and 82 mm in the same direction. Proposal B shows 37 to 100 mm. The geometry for proposal A is within that hypothetical axial drawing window. Proposal B crosses the forward boundary by 6 mm and needs review. This comparison does not check radial clearance, allowable dynamics or operating duty. The numbers demonstrate the method and are not UTEK-DELE clearance values.
Write the outcome so it is useful to the quote reviewer. For example, “offered sweep exceeds the marked forward boundary in the supplied drawing” gives the supplier a question it can answer. “Fan too thick” could refer to the hub, blade chord or the whole assembly. If the drawings use different axes, ask for a converted view agreed by both sides. Keep the approved overlay with the order and service documentation so a future re-order sees the same result.
See a 6W impeller operating in a housed fan
Watch the mounted fan and surrounding opening. This example illustrates the relationship of the sweep to the shroud. Order data for another machine must come from its own measurements and documents.
Confirm the actual part number, mounting geometry and operating conditions from the equipment file.
| Review | Useful original evidence | Expected reading of the comparison |
|---|---|---|
| Radial clearance | Actual opening and local restrictions versus drive centreline | Proposed sweep compared against the controlling region |
| Axial limits | Named reference face and position of nearby components | Minimum and maximum occupied position in the signed direction |
| Tapered shroud | Sections with width at relevant axial locations | Candidate envelope aligned with the actual section profile |
| Operational variation | Required conditions from equipment authority | Limits and checks return to the responsible engineer |
| Mechanical orientation | Viewpoint named on photos and drawing | Assembly direction matches the agreed reference |
Match rotation, airflow and duty as distinct inputs
Put two arrows on the drawing
Mark the direction of rotation as seen from one named side, such as looking from the drive toward the fan, and mark the required airflow direction independently. If a drawing is provided from the other side, transpose the viewing convention before comparing rotation statements. A photo from a side view can communicate where the fan sits; it cannot by itself define the direction of rotation. The label beside each arrow should say what is being shown.
Ask which direction the existing unit operates during normal service and whether the equipment has another approved operating mode. A reversed rotation input and a reversed airflow requirement are different questions. The configuration and equipment controls set what is allowed. For an assembly that needs rotation or airflow different from the old record, seek a fresh engineering review. A nameplate direction can be correct for one view while appearing reversed to another observer.
Carry the angle or pitch reference from the supplier's configuration drawing. Specify how the angle is named, in what view or at what reference where that matters to the order, and who sets the delivered pitch. The useful input is the approved setting for the offered assembly, with its duty evidence. Recreating a blade angle from a photograph risks misreading perspective and geometry. A replacement does not need to inherit an undocumented setting merely because its family code is familiar.
Collect comparable operating conditions
Give the expected airflow, resistance or pressure condition, speed and relevant power or load limit. Use the pressure basis and units specified by the engineer. Static and total pressure refer to different bases. A supplier's number at one basis cannot be compared to an acceptance point expressed on another without a valid comparison. Provide the required density or air conditions if the selection depends on them and make clear whether data describe nominal design or an observed machine condition.
Ask which operating conditions matter. A radiator installation, for example, may need comparable airflow in its working assembly with its normal downstream equipment. A housed ventilation application may prioritise an operating point against a particular resistance. The equipment authority sets the required points and method. An unrestricted airflow figure addresses only one condition and may not answer either requirement. Attach existing test records when you have them and record gaps as questions.
Account for retained drive limits. If a selected assembly calls for a power or torque assessment, share the approved drive information and the operating speed range from the equipment owner. Do not infer acceptable load from the old motor's nominal rating alone. Check startup and other defined conditions where the equipment authority requires them. A request that says the new assembly should provide the same air and stay within the drive's specified limits is more actionable when the measuring definition is included.
If performance information is missing, ask for the supplier's recommendation for a comparable duty check. Send the original build, machine description, installation dimensions and any confirmed operating data. Use a marked enquiry rather than write a guessed flow value in the purchasing system. An offer can remain conditional while the equipment owner resolves that question.
| Item | Provide if known | Question answered |
|---|---|---|
| Rotation | Direction with the drawing view | Which handed configuration is required? |
| Airflow | Direction and required volume flow at the defined condition | Which flow should the offered assembly deliver? |
| Pressure | Value, basis, units and relevant conditions | Against what resistance is the airflow required? |
| Speed | Agreed operating speed or defined range | What configuration and test result are comparable? |
| Drive and environment | Approved load limits and relevant duty or service conditions | What must the retained installation support? |
Select material and organise the purchase by machine
Keep material and approval separate from the shape
The offered material belongs on the assembly drawing and quotation. PAG, conductive PAGAS and die-cast aluminium are listed for the UTEK-DELE 6W family. Match the actual material to the equipment conditions and available configuration. If electrical behaviour, service temperature, exposure or a material approval matters, put the requirement and verification on the enquiry. A catalogue category or a part that looks alike does not establish equivalence for an equipment approval.
Material can affect rotating mass and may also accompany a change in other rated limits. Ask how the proposed configuration meets the stated duty and drive requirements. Discuss any different material as a separate quote option and identify whether it changes the overall configuration. For a repeat order it is particularly useful to record the supplier's full assembly reference and the selected material, so the material does not disappear when the item is entered as a short description.
If service involves a specific safety or compliance scope, refer to the equipment owner and the relevant documentation for the chosen assembly. Request the evidence needed for the named design, rather than relying on a generic statement about an impeller family. A material description can guide the discussion, but the operating limits of the completed air-moving system depend on the actual installation and approval basis.
Keep related W-series records distinct
Large adjustable-pitch W-series models can have similar-looking hubs or broadly overlapping family dimensions. Cross-check any legible part identification when a maintenance stock record has only “large W-series fan.” The UTEK-DELE axial fan replacement guide lists the 6W under complete assemblies. The model replacement cross-reference can help verify a profile or family before a buyer sends the request. Use the 6W assembly drawing and the equipment record to make the 6W decision.
In a mixed fleet, W-series records for different machines should have their own stock lines, even if two lines connect to the same nominal drive size. For example, the 5W family lists a W-3 hub and the 9W family lists W-3 and W-10. A shared hub designation does not determine the required blade, swept envelope or duty. Keep any actual installed 5W or 9W enquiry tied to its own assembly and machine where those references occur in the same facility.
A repeat-order record can use a simple label structure: equipment ID, original model and build, approved replacement assembly, drawing revision and applicable installation reference. If a procurement system requires a stock code without detail, make it point to the complete record. Keep images with the record and note which show the nameplate, mounting feature or actual shroud. Do not let an undated photograph replace the approved record.
Know which numbers are comparable before ranking two quotes
Suppose quote A includes a defined envelope and an agreed first-assembly check, and quote B gives the right family and the same diameter but leaves the mounting offset and material open. Request the missing drawings and selected material for B before treating prices as equivalent. A genuine optional configuration can still be worth carrying, with a stated approval dependency. Preserve both commercial offers and record the points that keep one from being an order-ready equivalent.
Use a simple list to separate conditions that a buyer can settle from those that need engineering. A buyer may confirm quantities, pack identifiers and whether hardware is to be supplied. A machine engineer may have to define acceptable sweep limits, connection fit or duty. The applicant who requested a fan can help recover service records but may not own those criteria. Map each open point to an owner and a response. That turns a question about replacement into a traceable configuration review.
When the two offers give data on different bases, ask for the version that answers the named requirement. A nominal platform range may be useful for screening. It cannot show that a specific configuration satisfies a point in the installed system. Similarly, a different value for power is meaningful only if the compared operating data have the same relevant basis and limits. Use the approved drawing and the relevant conditions to define what is acceptable before judging the commercial difference.
Finally mark which details need rechecking if the machine design changes. A repowered machine may have a revised drive, and a new heat exchanger or enclosure may change duty. Even a record of a good previous fit should send the next buyer to the retained-interface and operating data when reopening that item. Keep the new equipment revision linked to the new assembly line.
| Recorded item | Machine A in a hypothetical fleet | Machine B in the same hypothetical fleet |
|---|---|---|
| Connection | Retained shaft connection on drawing A | Retained adapter with a separate mounting face |
| Reference | Drive side seating shoulder | Mounting face on adapter drawing |
| Shroud review | Axial window at the radiator side | Opening narrows near the guard |
| Procurement disposition | Confirm drawing A against the offered build | Confirm adapter scope and use the B datum |
| Stocking logic | Order and label under the accepted A build | Keep the B build separate until engineering approves any commonality |
Quality Assurance for the first replacement assembly
Make the first-assembly review answer three questions
First, check whether the supplied assembly is the one authorised on the order. Read the model and drawing revision against the supplier's documents. Check the defined scope and the hardware record. If configuration and shipment records are separated, ask how to connect the physical assembly and the evidence. Confirmation of a family code alone leaves the selected hub, pitch and material unverified.
Second, have qualified personnel check proposed fit using the approved equipment procedures. Include the interface, seated axial position and agreed radial and axial checks. The fixture, tool or installation condition used for inspection should match the accepted review method. If any check cannot be performed where parts are received, show who checks it and how they record the result. When something differs from the drawing, keep the assembly on hold and send the actual value, datum and location to the responsible team.
Third, confirm the required duty review and balance records. Agree with the supplier what balance or test documentation is appropriate and what site checks the equipment design requires. Vibration or duty limits depend on the equipment, assembly and approval basis. A supplier's balancing step provides information about the shipped assembly; the assembled machine can also require verification under its own procedure. Record the references rather than assuming a criterion used on one machine applies to another.
Handle a mismatch as a drawing question first
A mismatch at the flange or bore brings the connection definition back into review. A clear sweep at rest in one direction may leave a clearance check unresolved in another view. A correct interface with uncertain airflow still needs a duty assessment. Keep these findings separate. Changing a part to address one condition can affect another. An approval should show who resolved the discrepancy and where the accepted configuration is documented.
If a shim, adapter or housing change is proposed, route it to the equipment authority and the manufacturer for review. A proposal changes the baseline in a way the next buyer should be able to reconstruct. Carry the resulting drawing and change authorisation in the plant record. Document which future orders are affected. A concession accepted for one machine or serial number does not, by default, release it for a whole group of machines.
A first-assembly review can prevent a repeat ambiguity. Store the supplier's accepted configuration, accepted mounting reference and inspection results under the equipment ID and original fan reference. Record the ordered quantity and whether the purchase included spares or hardware. When more than one similar fan is held in maintenance stock, label the boxes with the approved build or equipment reference as well as the model. That step makes fit and duty knowledge available at the moment of replacement.
| Stage | Document or check | Decision owner |
|---|---|---|
| Quotation | Machine-specific drawing, scope, material and duty assumptions | Buyer with equipment engineering |
| Drawing review | Approved interface, sweep and rotation or airflow references | Equipment authority and supplier as applicable |
| Receiving | Assembly identity, accepted drawing, order contents and documented checks | Receiving quality |
| Installation release | Approved fit, clearance and duty checks for the installed machine | Qualified equipment personnel |
| Reorder | Same retained components and valid assembly revision or documented change | Purchasing and engineering |
Send a 6W enquiry that can be quoted against the machine
Attach a marked photograph of the installed assembly, the original build reference, the machine connection and the shroud sections affected by the change. Provide the current drawing revisions and scale or units. Include a simple list of the items you expect to keep and those you expect the supplier to deliver. If any needed detail is still uncertain, mark it clearly. A supplier can identify which missing values affect the offer and which can be settled with an inspection or drawing check.
Compare the returned drawings from the same datum. Resolve the mounting and envelope first when those constraints are strict, then review pitch, rotation, airflow and duty using the same units and definitions. Ask for written confirmation of the selected W-3 or W-6 configuration where applicable. A confirmed drawing lets an equipment owner decide if an option meets the actual machine record instead of comparing an assortment of catalogue descriptions.
For a first order, give the UTEK-DELE technical team the complete enquiry and ask for a matched assembly configuration on a dated drawing. Identify who will approve mechanical fit and who will approve duty. Once the proposed assembly and supply scope are accepted, retain the documents so that a later order can identify the exact build that was installed.
Frequently Asked Questions
Is the UTEK-DELE 6W a direct replacement for Multi-Wing 6W?
Yes. UTEK-DELE supplies the corresponding 6W as a complete replacement impeller. Order the configuration that matches the retained drive, mounting, envelope and operating duty, and use the accepted drawing to identify the exact build.
Does a W-3 label identify the correct mounting connection?
The label identifies a hub family. Compare the actual connection, seating face, retention and applicable dimensions from the equipment and offered assembly drawings. The same printed family designation can accompany distinct machine-side configurations.
When should the W-6 option be considered?
Consider the manufacturer-proposed assembly indicated on the matched drawing. Give the supplier machine-side data and the required envelope and duty before deciding between W-3 and W-6. The respective family names are useful references but do not answer the mounting question themselves.
Do matching tip diameters guarantee the same fit?
A matched tip diameter establishes one dimension. You also need the position of the blade sweep along the shaft and the opening at that location. Check nearby fan-side hardware and clearances on the approved machine drawing and confirm them through the appropriate equipment procedure.
Can I order just the 6W blades for an existing hub?
Ask for a separate blade and retained-hub compatibility assessment. Identify the attachment, hub and build and follow the equipment approval procedure. The complete 6W assembly route uses its own matched hub and blades.
What if the old label is damaged?
Provide the equipment identity, any surviving part marks, photographs, approved service records and mounting and envelope data verified by qualified personnel. A technical review can determine which details still need measurement or confirmation before a replacement is specified.
Does a correct housing fit demonstrate the required airflow?
Mechanical fit and operating performance are different checks. Compare the required airflow, pressure basis, speed and drive limits to the offered configuration and arrange the evaluation required by the equipment authority.
What should I keep for a repeat order?
Preserve the ordered assembly reference, its drawing revision, original equipment and impeller identifiers, and the accepted installation and duty checks. Verify that the equipment and retained interface still match that record when reordering.
Final Thoughts
Use the 6W replacement relationship to start from the right family. Then define exactly what stays on the machine, compare the rotating envelope against that equipment and retain the selected assembly drawing with the duty and acceptance record. That makes the complete replacement an identifiable configuration for purchasing, engineering and future maintenance.